Testimonials
Discover what our clients say about working with Glosford SIPS.
“When Allister Godfrey first suggested using SIPS frames to build our house, we were intrigued and did some research. Turns out SIPS frames are best described as cost effective, engineered frames with built in insulation. These frames can be built according to our design needs.
They are also environmentally better from both manufacture and living in purposes. That sold us to the idea and we found a producer, Glosford SIPs, who were able, in conjunction with Allister, to produce all the frames needed for our new build. Timely delivery and rapid erection (another key factor with SIPS) produced a World Class building in good time.
The finished product is a thing of beauty and warmth. The sealed house is well insulated and conserves heat and cool well. We love it.”
March 2024
We have looked at the STA awards, and are proud that our project won.”
November 2022
December 2022
November 2021
I’d also really like to mention a special thank you to Richard and his Installation team (Chad/Nathan/Hughesy) for the sterling job they completed, their professionalism, work ethic and advice to me about on-going issues/tips. I was extremely impressed with this team and also their assurance in using Glosford and what Glosford do differently to other competitors in the design, build and ongoing support. That was very re-assuring to hear and I’ll certainly recommend Glosford SIPS.
Thank you.”
October 2021
September 2021
August 2021
August 2021
It is now a year since we moved into the house you supplied for us so I thought you might be interested to learn how we are getting on.
From an environmental perspective, we are thrilled with the performance of the envelope. The attention to detail of the erection crew has paid off in spades. We did boost matters by installing triple glazing, and we focused on ensuring airtightness across the whole structure. Rather pleasingly, we obtained an air permeability rating very close to that specified for a Passiv Haus. This has been reflected in our energy bills which, for the first year, amount to only £440. We do have a significant investment in solar and the ground source heat pump but the rate of heat loss from the building is so low that we were as warm as toast during the winter.”
July 2021
May 2021
April 2021
January 2021
Firstly, your office-based team, especially Tiago, Stuart, Mike and George, were always there to answer any query, large and small in a methodical and calm manner.
Secondly, your installation team under Nick’s supervision were exemplary, not only in the actual installation but in the days leading up to it, in providing useful advice in preparation to the main installation works. On the two days, on-site his team were professional in their standard of work. If we could highlight just a couple of features it would be their eye to detail and the way they conducted themselves on site.
Please can you pass on to Nick and his team our thanks for making what could have been a stressful time so easy if not enjoyable.
Finally, can we thank the other members of your staff who are behind the scenes and probably don’t get praise when it is due such as Beth in Accounts. All of them have looked after my queries in the same professional manner.
If and when we build another development, a SIPS build will be considered at the start with only Glosford on the list to carry out the work.
Many Thanks From A Very Happy Customer.”
July 2022
September 2021
September 2021
The install team were very well organised and worked really hard. The shape of the building presented some challenges during erection but all were overcome. Their attention to detail ensured that the airtightness of the envelope was of a very high standard. We have now reaped the benefits of this in very low running costs and a very comfortable dwelling.
We are thrilled with the result and look forward to many happy years in our new home.”
August 2021
July 2021
May 2021
May 2021
April 2021
March 2021